New House Builds | JAD Joinery

We bring you excellent house builds

FIRST FIX

First fix is the term used for the first phase of constructing a building. This phase of construction is everything from the laying foundations up to the point ready for plastering.

FINAL FIX

Final fix is where all types of ironmongery, fixtures and fittings are installed and checked. The building starts to look complete at this stage.

SECOND FIX

Second fix is the tasks that happen after the plastering process. This is to ensure the building has all the woodwork completed.

FURNITURE INSTALLATION

Furniture installation typically happens to the main areas of a house like the kitchen, bathroom and bedroom. This also apply to bespoke furniture like a custom fitted wardrobe.

The first fix tasks

  • Studwork
  • Timber kit construction
  • Floating Floors
  • Staircases
  • Windows & Window Boards
  • Exterior Doors
  • Internal Door Linings
  • Mid/Full height bathroom boxing’s

The second fix tasks

  • Internal hardwood and softwood doors
  • Architraves to door linings
  • Skirting and mouldings
  • Pre-formed door sets
  • Staircase components
  • Low level bathroom boxing’s

Final fix items

  • Locks
  • Fencing
  • Handrails
  • Door furniture & closures
  • Window handles
  • Laminates
  • Fascia boards

Furniture installation

  • Bathroom installations
  • Fitted kitchens
  • Bespoke wardrobes
  • Fitted bedrooms
  • Bespoke built-in furniture

Recent projects

This is our work and our heart. They are symbols for our vision, mission as well as our spirit. Take a look at them and you will understand us well.

JAD have an unrivalled workforce