Queen Margaret University, Musselburgh, East Lothian

Strip down & reinstate bulkhead (400 m2) within Main Reception area.

Scope of work: Assist with safe strip out of existing bulkhead & all associated fittings, reinstate to engineers new design.

ABC Ltd got back in touch with JAD after the QMU were told the major bulkhead was not fit for purpose, posed a serious threat to safety and must immediately be replaced. With students ready to resume their lectures from Monday 10th September JAD have a huge challenge ahead however we now have six Fixers working 12 hour Days & 6 Fixers on 12 hour Nightshifts including Weekends to achieve ABC/QMU’s ambitious deadline. We are confident our squads lead by our SSSTS Foremen can deliver winning us more work from the growing, Glasgow based Main Contractor.

Advanced Building Contractors Ltd

August 14, 2018

Fits Outs

1-2 Weeks

JAD Joinery Fit Out Contractor Advanced Building Contractors Ltd – Queen Margaret University