About the project

Queen Margaret University, Musselburgh, East Lothian – Strip down & reinstate bulkhead (400 m2) within Main Reception area.

Scope of work: Assist with safe strip out of existing bulkhead & all associated fittings, reinstate to engineers new design.

ABC Ltd got back in touch with JAD after the QMU were told the major bulkhead was not fit for purpose, posed a serious threat to safety and must immediately be replaced. With students ready to resume their lectures from Monday 10th September JAD have a huge challenge ahead however we now have six Fixers working 12 hour Days & 6 Fixers on 12 hour Nightshifts including Weekends to achieve ABC/QMU’s ambitious deadline. We are confident our squads lead by our SSSTS Foremen can deliver winning us more work from the growing, Glasgow based Main Contractor.

Duration: 1-2 weeks